
Electromagnetic compatibility (EMC) is the ability of equipment or systems to operate as required in their electromagnetic environment without causing unacceptable interference to other equipment. It has two aspects: emissions generated during normal operation must remain within specified limits, and equipment must have sufficient immunity to interference present in its environment. EMC assessment forms the electromagnetic compatibility part of CE compliance.
1. Certification Overview
Electromagnetic compatibility (EMC) is the ability of equipment or systems to operate as required in their electromagnetic environment without causing unacceptable interference to other equipment. It has two aspects: emissions generated during normal operation must remain within specified limits, and equipment must have sufficient immunity to interference present in its environment. EMC assessment forms the electromagnetic compatibility part of CE compliance.
2. Certification Mark

3. Certification Standards
|
Product |
EMC Standards |
|
ITE / AV Power Supplies and Products |
EN 55032 |
|
Lighting Products |
EN 55015 |
|
Household Appliances |
EN 55014-1 |
|
Industrial, Scientific and Medical Products |
EN 55011, |
|
Battery Products |
EN 61000-6-1 |
4. Test Items
| Radiated Emissions (RE), 10 m | Radiated Emissions (RE), 3 m |
| Radiated Immunity (RS) | Radiated Spurious Emissions (RSE) |
| Conducted Emissions (CE) | Conducted Immunity (CS) |
| Disturbance Power (DP) | Three-Loop Antenna (3Loop) |
| Surge (SURGE) | Electrostatic Discharge (ESD) |
| Electrical Fast Transient/Burst (EFT) | Voltage Dips & Short Interruptions (DIP) |
| Three-Phase Harmonics & Flicker (H&F) | Power-Frequency Magnetic Field (MS) |
| Discontinuous Disturbances (Click) |
|
5. Certification Process
1. Application: Complete the form, provide documents and send samples;
2. Quotation: Engineers determine applicable standards, test duration and fees from the information provided;
3. Payment: Accept the quotation, sign the project application and service agreement, and pay the fees;
4. Testing: The laboratory performs the full test program against relevant EU standards;
5. Testing passes and the report is completed;
6. The project is completed and a CE certificate issued.
6. Certification Timeline & Validity
Timeline: Approximately 2 weeks. Testing problems, incomplete samples or other exceptional circumstances may require additional time.
Validity: Depends on whether the standard remains valid. If the standard expires, the certificate also expires and recertification is required.
7. Factory Audit
No factory audit required
|
EU CE-EMC Certification |
|
· Testing Content: EMC · Applicable Products: All electrical and electronic equipment within the EMC Directive's scope · Mandatory: Yes · Factory Inspection: None · Local Representative: Required · Plug Type: European · Voltage Requirement: AC 230 V, 50 Hz · Application Route: Direct application · Certificate Holder: · Certificate Validity: Reapplication required when standards change · Official Website: · Certificate Verification Website: · Additional Notes: |