
DOE stands for the US Department of Energy. DOE energy efficiency certification is based on US electrical and electronic product regulations and aims to improve efficiency, reduce energy consumption, conserve energy and reduce greenhouse effects. It covers more than 60 product types. Registration on the DOE energy efficiency website is made in the name of the manufacturer or trader and must be searchable online. Registration under the overseas customer's name is recommended.
1. Certification Overview
DOE stands for the US Department of Energy. DOE energy efficiency certification is based on US electrical and electronic product regulations and aims to improve efficiency, reduce energy consumption, conserve energy and reduce greenhouse effects. It covers more than 60 product types. Registration on the DOE energy efficiency website is made in the name of the manufacturer or trader and must be searchable online. Registration under the overseas customer's name is recommended.
2. Certification Mark
Mark unavailable
3. Product Scope
1.Battery Chargers
2.Boilers
3.Ceiling Fans
4.Central Air Conditioners and Heat Pumps
5.Clothes Dryers
6.Cloths Washers
7.Computer and Battery Backup Systems
8.External Power Supplies
9.Dehumidifiers
10.Direct heating Equipment
11.Dishwashers
12.Furnace Fans
13.Furnaces
14.Hearth Products
15.Kitchen Ranges and Ovens
16.Microwave Ovens
17.Miscellaneous Refrigeration
18.Pool Heaters
19.Portable Air Conditioners
20.Refrigerators and Freezers
21.Room Air Conditioners
22.Set-Top Boxes
23.Televisions
24.Water Heaters
4. Certification Standards
|
Product |
Energy Efficiency Standards |
|
External Power Supplies (EPS) |
10 CFR 430, Subpart B, Appendix Z. |
|
Battery Charging Systems (BCS) |
10 CFR 430, Subpart B, Appendix Y. |
5. Required Documents
1. Samples
2. Product Technical Documentation
3. Product Nameplate
4. Certification Application Form and Other Documents
6. DOE Certification Process
1. Provide samples for testing (at least two units);
2. Laboratory testing;
3. Issue the report after successful testing;
4. The laboratory arranges registration (US importer or manufacturer information is required).
7. Certification Timeline & Validity
DOE certification takes 3–4 weeks from data submission, excluding testing time.
8. Factory Inspection
DOE certification does not require factory inspection.
|
US DOE Certification |
Mark unavailable |
· Testing Content: Energy Efficiency |